Wigner data center for CERN

cern_epulet_keszTask: Implementation of the datacenter’s construction project.

  • IT whitespace: 1200 m2
  • Cooling pipeline: more than 3.2 km
  • Copper cables: more than 40 km
  • Optical fibre: more than 100 km
  • Usable rack space: more than 18 000 RU
  • More than 200 m3 concrete for structural reinforcement
  • Roof: 210 tons of stainless steel
  • 5600 kW cooling capacity
  • Water pump capacity: 2100m3/hour
  • 8 MVA power capacity
  • 2816 maintenance free batteries with 10 years estimated lifetime
  • More than 100 rack cabinets/room
  • 2x100 Gb/s connection between CERN and Wigner DC
  • Core network speed: 100 Gb/s
  • WAN capacity is higher than BIX (Budapest Internet Exchange) aggregate traffic
  • Integrated Building Management with more than 30.000 data points monitored
  • Continuous data availability for more thousands of CERN researchers
  • Infrastructure SLA: 99,987%

Invitel group

Tasks: Full array of operational management services, troubleshooting and maintenance for all server rooms for Invitel.

  • Project volume: 10 server room, 2 locations

Tasks:  Create a multiversion datacenter development concept

  • Project volume:  1000 m², more than 1 MW.
  • Estimated invetment value: 2 mrd HUF

Tasks: 150 m² server room development, design and turnkey implementaion

  • EM & RF protection
  • Architectural development
  • MABISZ protection
  • Fire protection
  • Power supply distribution
  • Cooling system
  • Building management system
  • Fire extingusiher and sprinkler system
  • Security system

Data Center and office building of Hungarian public administration

nav_szovegbe2Tasks: Create the complete general contractor tasks for the central state server room  (The exact name and technical specification of the reference can not be published)

Year of implementation: 2009 - 2010

Project duration: 12 months

Budget: more than 4 billion HUF

Total field of construction: more than 3000 sqm

In-built electrical capacity: 2 megawatt in a redundant structure

Maintenance and facility management of the telepített systems

An investment with qualified data handling

Due to the increasing electronic governmental activities, a need came up for a central public administration data center and office building which is capable to host the newest IT technology and the related operational personnel. During the investment, one of the most secure and foolproof data center of Hungary and the related service rooms – office spaces, storages - has been constructed, according to the most modern requirements. During the project our company was responsible for the general implementation planning and since then we provide availability and maintenance services related to operation.

Ferenc Liszt International Airport/Budapest Airport

liszt_ferenc_repter_szovegbe_1

General design and construction service for the Budapest Liszt Ferenc Airport in relation to its new security  and fence protection system.

Project in details:

  • design and implementation of complex protection of 1,500 acres of land by installing weatherproof,
  • independent sensors and camera systems with low power consumption,
  • long life and less false alarm
  • 28 km, 3.1 meter-high of integrated security fence system
  • designing overall application and integration technical concept to fulfill strict international standards
  • full redundancy to ensure high availability (SLA) and fast signal processing, traceability
  • entire system can be easily expanded as required

US Government (Department of Energy/Professional Project Services) and Sandia National Laboratories

  • Protection of sites (33) using or safe-storing radioactive sources in Hungary for US Government (Department of Energy/Professional Project Services) and Sandia National Laboratories (a leading multiprogram engineering and science laboratory) within the “Global Threat Reduction Initiative”.
  • Developing following system: detection equipment, shadow elements, sensors and intrusion systems in order to increase the security level of sites using or safe storing radioactive sources in Hungary
  • Implementation ( more than 35 locations in Hungary) – complex security system and radiation protection system
  • Exclusive partner: 3 + 5 year contract
  • NAÜ, based on american-hungarian regulation

National Office of Courts

Courts of Justice/Tribunals in Budapest, on countryside:general design, construction and maintenance service for OBH (National Office of Courts) in connection with their entire security system.

  • Redesign, construction and operational management services
  • Intrusion detection
  • Access system
  • Video surveillance
  • Automatic fire extinguising system

Zollner Elektrik Vác New Lampertz Server room

Zollner Elektrik green field investment

Tasks:  arhitecture, HVAC, high voltage supply system, UPS, fire extinguising and sprinkler system, interior design  (100 m² server room + 50 m² technical room.)

  • Year of implementation: 2007
  • Project duration: 6 months
  • Physical security qualified by European Certification Board
  • Implementation according to international standards
  • Development of electric supply system
  • Operational management and maintenance of installated systems

The first green field project of our company, as a partner of IBM Hungary Ltd., was a data center construction project for Zollner Group, an active player of the international automotive and hardware production market. During the project the highest-level, also according to German standards, implementation quality and technology work has been realized. Within the frames of the project a high security, international standard-based data center construction has been realized which serves more than 2000 workers within the Hungarian manufacturing unit.

Raiffeisen Bank, new central datacenter

Tasks: Design of server room, implementation and operational management

  • Preliminary concept plan for the new computer room, combined with risk managment
  • Developing a computer room with Lampertz tecnology in 200 m²-en
  • Operational management and maintenance of the the installed systems

Raiffeisen Bank, Lampertz Datacenter

Tasks: Design of  55 m² computer room with  Lampertz technology  (HVAC, UPS, high voltage distribution, energy distribution, fire extuingising, sprinkler system, interior design)

  • HVAC
  • Fire extuingising and sprinkler system
  • High voltage energy supply
  • Implemention of building management system
  • EMC protection system
  • Operational management and maintenance of installed systems

Chain bridge palace

Tasks:

  • Implementation of 20m2 protected meeting room
  • Development of minimum 60dB, 100Mhz-3Ghz elektromagnetic shadow system

T-Mobile, Central Lampertz Datacenter

Task: Design, impelment, facility management of server room

  • Designing 35 m² computer room with modular technology
  • Implementation of computer with Lampertz technololgy
  • Operational management and maintenance of installed systems

Pro-M, Lampertz Datacenter

Tasks:

  • 35nm computer room with modular technology
  • Implementation of a computer room with Lampertz technology
  • Operational management and maintenance of installed systems

Jail in Vác

Tasks:  Development of 20 m² computer room

  • Development of EMC protection
  • Development of high voltage power supply
  • Fire extinguising - and sprinkler system
  • Project management and coordination of subcontractors

Netlock Ltd.

Tasks:

  • Modular saftey rack
  • Lampertz Modulsafe
  • Development of a server safe cooling system
  • Implementation of CMC management system

Accor Hotels

Tasks:

  • 18pcs server rooms
  • Risk management for physical security
  • Reconstruction of high voltage network of server room, overvoltage protection
  • IT network, building network
  • Unified server room documentation
  • Elimination of critical physical saftey defects

Bosch Security Ltd. IT technician room

Tasks: Implementation of Lampertz rack protection system

  • Fire extinguishing and sprinker system
  • Cooling system
  • BMS
  • UPS

National Office of Measures

Tasks: Complex design and implementation work.

  • Implementation plan
  • Architectural reconstruction of the server room
  • Redundant HVAC
  • UPS
  • Energy distribution
  • Fire extinguising and automatic sprinkler system
  • Security system
  • BMS system

Institute of Geodesy, Cartography and Remote Sensing

Task: Design and construction of the new data center (70 m² server room + 35 m² technical room) during 16 weeks.

  • Architectural reconstruction
  • Lampertz LER server room
  • Energy efficient cooling of redundant server room
  • UPS
  • Energy distribution
  • Fire extinguisher system
  • Security system
  • BMS
  • IT network
  • EMC protection
  • Maintenance and facility management of installated systems.

National Infocommunicaton Service (NISZ)

Tasks: Construction of cloud server room for the government

  • Electricity capacity: 400 kVA
  • Object surface: 300 m²
  • Architectural reconstruction, cooling system, UPS, IT network, BMS, fire protection, security system.

T-Systems Germany

Task: Aquireing to receive TIER quality certification for an already existing data center.

The Node Pole – Cluster of cloud technology and construction partners

Task : Create multiversion datacenter development concept